Since 2008
Based in Belgium and France
+ 60 000 clients
Our blog
A.S.S.
Shopping Cart
Comprehensive technical guide to Deye hybrid inverter configuration: energy bus architecture, critical BMS...
Découvrez comment la tarification dynamique et le tarif Impact ORES transforment la rentabilité du stockage d'énergie...
Guide complet pour configurer un onduleur DEYE triphasé sur réseau 3x230V sans neutre (IT) en Belgique. Procédure de...
Discover photovoltaics from A to Z: operation, components, installation and profitability. An accessible guide to...
Décryptez les unités électriques essentielles du photovoltaïque : ampères, volts, watts, kWc, kWh, VA. Explications...
4. Underestimating the Importance of Wiring and Electrical ProtectionsSafety and Performance: Proper Wiring Is MandatoryWiring represents 8 to 12% of the total cost but determines 100% of the safety. Wiring errors are the cause of 65% of electrical incidents on PV installations.Common mistakes:Insufficient cable cross-section: overheating, line losses (up to 5% of production)Non-compliant cables: use of standard domestic cables instead of UV-resistant PV cablesNo DC protections: no disconnect switch, fuses, or surge protector on the DC sidePoor tightening of MC4 connectors: contact resistance, risk of electric arcAccurately Calculate the Required Cable Cross-SectionCable sizing is not improvised: a cross-section that is too small generates continuous financial losses for 25 years, while an oversized cross-section represents an unnecessary extra cost. Voltage drop must never exceed 3% between the panels and the inverter.🔌 FREE PROFESSIONAL TOOLCalculate the optimal cable cross-section for your installation in 2 minutes⚡ VOLTAGE DROP CALCULATOROur free calculator takes into account all the essential parameters:Exact distance between panels and inverterOperating voltage of your installation (12V, 24V, 48V, high voltage)Maximum current and transmitted powerType of current (DC for panels-inverter, AC for inverter-grid)Ambient temperature and correction factorInverter-panel distanceRecommended minimum cross-sectionLine losses0-10m4 mm²< 1%10-20m6 mm²< 2%20-30m10 mm²< 3%> 30mSpecific studyHigh risk“Professional wiring with suitable cross-sections and compliant protections guarantees safety for 25 years. It's a €200-300 investment that protects a €10,000 system. Use our free calculator to avoid any sizing errors.” — Wattuneed Design OfficePhotovoltaic Cables: Mandatory SpecificationsWarning: Domestic cables H07V-K or U-1000 R2V are NOT suitable for a photovoltaic installation. You must imperatively use specific PV cables (EN 50618 standard or equivalent) featuring:UV and weather resistance (outdoor lifespan 25+ years)Operating temperature -40°C to +90°C (up to +120°C peak)Double reinforced insulationResistance to ozone and chemicalsLow smoke emission in case of fireEssential Electrical ProtectionsEvery installation must include:DC side (direct current): disconnect switch, overcurrent protection, Type II surge protectorAC side (alternating current): 30mA Type A residual current circuit breaker, decoupling protectionGrounding: < 30 Ω required, equipotential bondingRefer to the detailed Wattuneed wiring diagrams for an installation compliant with NF C 15-100 and IEC 62548 standards.⚠️ Concrete Example of a Costly Mistake:5 kWp installation 25m from the inverter with 4mm² cable: 4.5% loss, i.e. €225/year. Over 25 years = €5,625 lost. A 10mm² cable would have cost €180 more at installation. Calculate your case →
check_circle
This store asks you to accept cookies for performance, social media and advertising purposes. Social media and advertising cookies of third parties are used to offer you social media functionalities and personalized ads. Do you accept these cookies and the processing of personal data involved?