Since 2008
Based in Belgium and France
+ 60 000 clients
Our blog
A.S.S.
Shopping Cart
Découvrez le système triphasé 15 kVA Wattuneed : 29 panneaux AIKO ABC 460W, 3 onduleurs Victron MultiPlus-II, 30 kWh...
The solar battery industry is undergoing a major technological revolution: active thermal management, sodium-ion,...
Are you considering equipping your motorhome, boat, tiny house or home with a photovoltaic system? The first question...
Discover how to configure Deye Copilot step by step to maximise your energy savings. Comprehensive guide with...
Augmentez votre taux d'autoconsommation de 20 à 40% sans investir dans de nouveaux panneaux. Découvrez 12 actions...
Installing Pylontech US5000 solar batteries is a crucial investment for your photovoltaic system. These lithium-ion batteries offer a reliable and high-performance storage solution, but their commissioning must follow a rigorous procedure to ensure safety and longevity. This detailed guide takes you step by step through the professional installation of your solar batteries.Essential safety precautionsBefore handling the batteries, it is essential to follow these safety instructions to avoid any risk of electrocution or irreversible damage:Disconnect the mains power supply before carrying out any workNever connect the battery directly to the AC power supplyAlways observe the polarity (+ and - terminals)Ensure grounding with resistance < 0.1ΩWear protective equipment: insulated gloves, goggles, safety shoesNever dismantle the battery (loss of warranty)Do not use the switch button during operation (risk of short circuit)"Safety first: improper installation of Pylontech equipment may cause irreversible damage and void the warranty" - Official Pylontech manualRequired equipment and content verificationEach Pylontech US5000 solar kit includes:US5000 battery module (40kg)2 x 210 mm 4AWG power cables1 x 210 mm RJ45 communication cable1 x 1000mm 6AWG grounding cableScrew kitExternal cables tothe solar inverter are usually supplied separately depending on your configuration.Choice of location and mechanical installationLocation criteriaThe location must meet the following requirements:Flat, clean surfaceStable temperature between 0°C and 50°CProtected from humidity, dust and direct lightMinimum distance of 2 metres from heat sourcesMinimum distance of 0.5 m from the air outlet of an inverterRack installationFor multiple solar battery installations:Insert each module into the rack providedSecure with the 4 screws providedMaximum of 3 batteries stacked verticallyUse the coupling locks between batteriesConfigure addresses and DIP switch settingsMaster/slave principleIn a parallel installation, one battery is designated as the master and the others as slaves (maximum 15 slaves per master).Identification of the master: This is the battery whose Link 0 port remains free (unconnected).Configuring the DIP switchesThe DIP switches are configured as follows:DIP SwitchPosition 0Position 1UsageDIP1115,200 bits/s9600 bits/sRS485 speedDIP2CAN resistance enabledCAN resistor disabledCAN communicationDIP3-4Not usedNot usedReservedRecommended configuration for Victron and WKS invertersFor standard solar inverters (Victron, WKS, etc.):DIP1 = 1 (9600 bits/second)DIP2 = 0 (CAN resistance activated)Configuration: 1000Installation example: 4 batteries in parallelWiring diagramFor an installation of 4 Pylontech US5000 solar batteries:Master battery: Link 0 port free, DIP switches set to 1000Slave batteries: Identical DIP switches set to 1000RJ45 connections: Link 1 → Link 0 chaining between batteriesDC connections: All batteries in parallel (+ together, - together)Wiring sequenceConnect the earth to each batteryInstall the DC circuit breaker (≥60VDC, type C or D)Wire the power connections in parallelConnect the RJ45 cables in seriesCheck all connections before powering upRetrofit procedure: adding a battery to an existing fleetCaution: This procedure is crucial to preserving the life of your solar batteries.Preparatory stepsCharge all batteries to 100% before interconnectingCheck that the charge levels are balancedSwitch off the systemWait at least 15 minutes after adding a batteryWhy take this precaution?Batteries with different charge levels can cause:Excessive equalisation currentsPremature cell wearPermanent system imbalancesA significant reduction in service life"Pre-retrofit battery balancing is essential: it prevents destructive equalisation currents and ensures optimal performance" - Wattuneed expertStep-by-step commissioningStart-up sequenceFinal check: Check all connectionsCircuit breaker: Close the protection circuit breakerUS5000-B modules: Set all module circuit breakers to ONPower Switch: Set all modules to ONMaster start-up: Press the red SW button on the master for >0.5 secondsSoft start: Wait 3 seconds for all LEDs to gradually light upPost-startup checksCheck that there are no alarms (red light, buzzer)Check the balance of the SOC LEDs (≤1 LED difference)Test communication withthe solar inverterSafe shutdown procedureFor temporary decommissioning or maintenance:Switch off the external power sourcePress the red SW switch on the master moduleSet all Power Switches to OFFSet the circuit breakers to OFFOpen the external disconnection deviceMaintenance and monitoringPeriodic checksMonthly: Visual inspection of connections and indicator lightsAnnual: Check the tightness of all connectionsStorage: Charge to 90% every 6 months if not in useWarning signsContact a professional immediately if you notice:Permanent red indicator lightAlarm buzzerAbnormal heatingPersistent imbalance of SOC LEDsEconomic analysis and return on investmentInstallation costsThe cost of a Pylontech US5000 installation includes:Battery: between €1,200 and €1,500 per moduleCabling accessories: €100 to €200Professional installation: between €300 and €500Return on investmentWith a properly sized solar kit, the return on investment is between 8 and 12 years, depending on:The price of electricity in your regionYour consumption profileThe self-consumption rate achievedCompatibility with invertersPylontech US5000 batteries are compatible with most solar inverters on the market:Victron Energy: MultiPlus-II, QuattroDeye: Hybrid rangeWKS: EVO SeriesGoodwe: ET SeriesCommunication is via CAN or RS485 protocol depending on the inverter model.Frequently asked questions (FAQ)Can I mix different models of Pylontech batteries?No, mixing different battery models is strongly discouraged. Only use identical batteries to ensure performance and safety.How many batteries can I connect in parallel?A maximum of 16 batteries per group, with a maximum of 15 slaves per master. For larger installations, several groups must be created.What should I do if the SOC LEDs are not balanced?Leave the system to rest for at least 15 minutes. If the imbalance persists beyond a difference of 2 LEDs, contact your installer.How often should I check my installation?A monthly visual check is sufficient. A full technical check by a professional is recommended annually.Can I install the batteries outdoors?No, Pylontech US5000 batteries are not designed for outdoor installation. They must be installed in a dry, temperate room.Wattuneed - Your partner in renewable energyRue Henripré 124821 Andrimont, BelgiumTelephone: +32 87 45 00 34Email: info@wattuneed.comFor all your solar battery and solar kit projects, trust Wattuneed's expertise. Our certified technicians will assist you from the design to the commissioning of your photovoltaic installation.
check_circle
This store asks you to accept cookies for performance, social media and advertising purposes. Social media and advertising cookies of third parties are used to offer you social media functionalities and personalized ads. Do you accept these cookies and the processing of personal data involved?