Blog navigation

Latest posts

Deye Copilot Complete Guide: Configure and Optimise Your Solar Installation
Deye Copilot Complete Guide: Configure and Optimise Your Solar Installation
0 views

Discover how to configure Deye Copilot step by step to maximise your energy savings. Comprehensive guide with...

Read more
Autoconsommation solaire : 12 actions pour gagner +20 à +40%
Autoconsommation solaire : 12 actions pour gagner +20 à +40%
352 views

Augmentez votre taux d'autoconsommation de 20 à 40% sans investir dans de nouveaux panneaux. Découvrez 12 actions...

Read more
Batterie Physique vs Virtuelle France 2026 : Comparatif Complet
Batterie Physique vs Virtuelle France 2026 : Comparatif Complet
877 views

Batterie physique ou virtuelle pour votre installation photovoltaïque ? Découvrez notre comparatif complet 2026 avec...

Read more
Deye Hybrid Inverter Configuration: Complete Engineering Manual 2026
Deye Hybrid Inverter Configuration: Complete Engineering Manual 2026
2497 views

Comprehensive technical guide to Deye hybrid inverter configuration: energy bus architecture, critical BMS...

Read more
Photovoltaic Earthing: RGIE/NF C 15-100 BE/FR Standards
Photovoltaic Earthing: RGIE/NF C 15-100 BE/FR Standards
1315 views

Mise à la terre photovoltaïque conforme RGIE (Belgique) et NF C 15-100 (France) : résistance ≤30Ω, sections câbles...

Read more

Technical Guides

The electrical aspects of a photovoltaic installation require rigour and compliance with standards to ensure the safety of people and property. Sizing of protective devices, choice of cable cross-sections, and earthing are all crucial technical steps.

This sub-category includes all electrical technical guides: circuit breakers and AC/DC protection, cable cross-section calculation, single-line diagrams, earthing and lightning protection, compliance with NF C 15-100 standards and UTE C 15-712-1 guide.

The Definitive Guide to Circuit Breakers 2026. Our comprehensive reference (116 views) explains everything: circuit breaker ratings according to nominal circuit current, B/C/D curves and their applications (B for residential, C for inductive loads, D for motors), AC sizing (panel circuits → inverter → grid), and DC sizing (PV strings, batteries). Summary tables for 3kWp, 6kWp and 9kWp installations.

Cable cross-sections: essential calculations. The voltage drop must not exceed 3% in DC and 1% in AC. Formulas: Cross-section (mm²) = (2 × Length × Current) / (Conductivity × Permissible voltage drop). Examples: 10A string over 20m → minimum 4mm² copper. 100A battery-inverter connection over 1m → minimum 25mm².

You will also learn about earthing (equipotential bonding of panel frames, Type 2 lightning protection), regulatory signage (DC labels, emergency cut-off) and Consuel procedures for compliant commissioning.

 
Sort by:
Showing 1 to 5 of 5 (1 Page)
Loading...